Work Update
Danville Route 2 Project
Project: Danville FEGC 028-3(32)
Week of June 27th, 2011
Pike Industries will be performing the following work on the Danville Route 2 project as follows:
Waterline and storm drain work will continue between Marty’s Store and Smith Street in the westbound lane of Route 2. The work will remain centered in this area for most of the week and will require lane closures.
Waterline work will include Smith Street as well this week.
Starting Monday, reclamation of the existing roadway on Route 2 will continue from Park Street to the project limit west of the Danville School. This work will require lane closures.
Temporary Water: Temporary water services will be connected this week along Route 2 from Park Street west to the project limits. This work is necessary in preparation for blasting which is planned for the week of July 4th.
All work this week will start at 8 am each day.
Traffic delays can be expected in and around the project for the entire week. Traffic control will be present to maintain traffic flow at all times. Motorists are encouraged to plan accordingly.