TRAFFIC
ALERT
Danville
Route 2 Project
Project: Danville FEGC
028-3(32)
TUESDAY,
May 8, 2012
Issued: 9:30 am
Issued: 9:30 am
UTILITY
DUCT BANK WORK:
Hill
Street – Effective
Immediately
- The bottom of Hill Street near the intersection with Route 2 is currently
reduced to one lane travel.
Motorists
can access Hill Street from Route 2.
Traffic control is present to assist motorists.
Cars
that are trying to access Route 2 from Hill Street are being re-directed to
Highland Ave.
Peacham
Road – Peacham
Road is one-way today between Route 2 and Park Street.
Traffic
coming from Route 2 can turn onto Peacham.
Traffic
coming up Peacham to Route 2 is directed to Park St to get to Route
2.
ROUTE
2 WORK:
Crews
will continue installing drainage pipe at Walden Hill Road and work their way
west. This work will require alternating one-way traffic around the work
zone.
No comments:
Post a Comment