Monday, January 30, 2006
This is a recent message from Evelyn Richer down on Sandy Beach Road at Joe's Pond. We posted pictures earlier of the building going on down there, and here's an update: "They moved the modular sections of Rachel Lewis' house in (old Hardy camp), but they are not placed yet. They brought them in late at night, after dark, from PA and got one of the tractor trailer trucks stuck. Then the other one showed up with the other half of the house, so we had the two house halves, two tractor trailer trucks, three cars, and two pick-ups in the culdesac, then we had to call the wrecker which was HUGE because one of the big trucks was jack-knifed!"
"The pictures weretaken the following afternoon. Mathews Construction is moving the second house half - it took him only minutes to get it off the road where it had been wedged up against our mailbox when all the traffic left the night before and guide it down the driveway onto Rachel's lot. As you can see, it was snowing, but with the right operator and equipment, everything went smoothly." (A special thankyou to Ray and Evelyn Richer for sending me these photos).
Subscribe to:
Post Comments (Atom)
News & Chatter
I was saddened this morning when I read in the Caledonian Record that Archie Prevost passed away. Archie was well known around Joe's P...
-
Another spring day and again we've had a bit of everything. Not much sunshine, but the temperature got well into high 50s. On the news...
-
Most of Vermont is struggling this morning, either cleaning up after high water damage or trying to "get there from here." Roads a...
-
We finally have an official Ice-Out time - 4 a.m. today, April 14, 2024! There are thousands of tickets sold each year and our data speciali...
No comments:
Post a Comment